Instrument panel · six tools · calibrated

Work it out
before you buy it.

No sign-up, no gate, no email for a number. Six instruments that answer the six questions this market asks every day — and every one of them shows its workings further down this page, so you can check us instead of trusting us.

  1. 01 · Material estimatorHow much does the job need?
  2. 02 · Trip & truck plannerHow many loads is that?
  3. 03 · Collect vs deliveredWhich way should I buy?
  4. 04 · Cement savingWhat is dirty sand costing me?
  5. 05 · Silt self-testIs this sand carrying mud?
  6. 06 · Full-measure checkAm I getting what I paid for?

Without JavaScript Each result below is worked from the starting figures in its fields. Change any figure and press Calculate — your result opens on its own page, ready to send to dispatch.

Material estimator

How much sand does the job need?
Volume42m³
Trips · 30 m³2

Trip & truck planner

Cubic metres → trips, by truck class

No storage on site? Ask dispatch for phased just-in-time drops.

ClassCap.Trips
Single-axle7 m³26
Double-axle12 m³15
Standard20 m³9
Large30 m³6
Max45 m³4

Collect vs delivered

The two ways to buy, side by side

Collect at source

6trips you run
  • You bring the tippers
  • No haulage margin
  • ~30 min load, 24/7
  • Ticketed at the gate
How it works →

Delivered to site

6trips we run
  • Partner haulage nationwide
  • No fleet to manage
  • Scheduled to your pour
  • Photo + GPS proof
How it works →
Most of an Accra trip price is haulage and middlemen — not the sand

Cement-saving calculator

Cleaner sand → less cement, fewer rejects
Blocks saved / mo600
Cement bags saved29

Silt self-test

The bottle test — is your sand carrying mud?
4.8%Below 8%: low silt on this field heuristic. A lab sieve test confirms it.
Settled, 1 hr
Illustrative field heuristic: below 8% low · 8% or more high. A lab sieve test and the project specification decide

Full-measure check

What does that tipper actually hold?
True capacity17.9m³
Difference−2.1 m³
That bed holds 17.9 m³ struck level — 2.1 m³ less than you were charged for. Buy ticketed →
The back of the instrument

Every assumption, published.

Most calculators on supplier websites are lead-capture forms wearing a lab coat — the number only appears after your phone number does, and nobody tells you what the number was built from. Here is what each of ours actually does, and where it stops being reliable.

01

Material estimator

What it computesFour project presets — bungalow 42 m³, four-storey frame 180 m³, estate phase 520 m³, one kilometre of road base 1,400 m³ — with a scale slider from 0.25× to 3×.

Where it stopsThese are planning-order figures, not a bill of quantities. Wall areas, screed depths and mix designs move them substantially. Use it to size the conversation, then let your QS size the order.

02

Trip & truck planner

What it computesYour volume divided by five real tipper classes: 7, 12, 20, 30 and 45 m³, rounded up to whole trips.

Where it stopsTrips round up because half a truck does not arrive. Struck capacity is assumed — a heaped load carries more, which is exactly why the sixth tool exists.

03

Collect vs delivered

What it computesThe same volume expressed as trips you run versus trips we run, at 30 m³ a load.

Where it stopsWe deliberately publish no cedi figures here. Haulage is priced by zone, road condition and how many trucks the corridor needs that week — a made-up number would be worse than none.

04

Cement saving

What it computesBlocks saved = half your current reject rate. Bags saved expresses a 5% cement reduction across the same run, at a nominal 35 blocks a bag.

Where it stopsA model, openly. Halving rejects is what clean, consistently graded sand tends to do for a moulding yard; it is not a promise, and your mix design governs. Run a trial load and measure your own numbers.

05

Silt self-test

What it computesSilt percentage = the settled mud layer divided by the total settled column, after roughly one hour in a clear bottle.

Where it stopsThis is the field test the trade has used for decades, and it is genuinely useful — but it is a field test. The verdict uses 8% as an illustrative heuristic: below 8% reads as low silt, 8% or more as high. It is not an acceptance limit; a laboratory sieve test and the project specification decide.

06

Full-measure check

What it computesTrue struck capacity = length × width × side height, in metres. The difference is what you were charged for against what the body actually holds.

Where it stopsMeasure the inside of the body, not the outside. A heaped load adds roughly 10–15% over struck, which is why a ticket at the gate settles arguments better than an eye.

Reference

Sand is sold by volume.

Every figure on this page — and every ticket at our gate — is in cubic metres. That is the unit the trade prices in, the unit a tipper body is measured in, and the unit that makes short loads visible. If a supplier will only talk in "trips", ask what a trip holds.

The classes below are the tipper sizes that actually work this corridor. We load all of them, from a single-axle carrying seven cubes to a forty-five cube long-body, and we do not turn small trucks away.

Tipper classes we load · struck capacity
ClassCapacityTypically
Single-axle7 m³Small builds, repairs, one-room jobs
Double-axle12 m³Blockyards, plastering runs
Standard tipper20 m³The workhorse of most sites
Large tipper30 m³Frames, slabs, estate phases
Long body45 m³Road base, bulk contracts, export runs
Numbers first · Volivo 6.0927° N