Most suppliers are a phone number and an assurance. This is the full chain — the
purpose of the work, who commissioned it, who executes it, where we sit in it, and how the money
and the records are handled. Read it and then come and stand on the site.
GovernedSOURCELower Volta
The purpose
A river that needed clearing
The Lower Volta silts and chokes. When the major dams spill, a constricted channel puts the towns downstream at risk, and aquatic weed — water hyacinth above all — closes the water to boats, to fishing and to flow. The programme exists to reverse that: dredge the channel, harvest the weed.
Socio-ecological project
The customer
Volta River Authority
The programme is run for the Volta River Authority — the national body responsible for the Volta and for the power generation that depends on it. This is not a private extraction licence dressed up as a public good. The customer is the authority itself.
Named on the site banner
The contractor
JSC Mediterranean Ghana Ltd
The general contractor executing the works, on a ten-year dredging contract awarded by the Volta River Authority for the Lower Volta — stated publicly by the company at a press conference in Accra in September 2025. A project team of specialist partners covers dredging, logistics and site operations, and the dredging entity holds the operating licences and regulatory cover for lawful work on the river.
General contractor · 10-year VRA contract
The by-product
The sand the work leaves behind
Dredging a channel produces material, and that material is our four grades. It is lifted at Volivo and stockpiled on site. Nothing is extracted for its own sake — the volume is a consequence of the channel work.
Volivo · Lower Volta
Our position
Volta Sands — the commercial arm
We are the market side of the operation: bringing buyers to the site, arranging loaders and buyer access, and running supply so the material reaches the construction economy instead of sitting on a bank. Volta Sands is a GKM Legacy Holdings company, partner to Sarbah Limited and its authorised commercial agent for the Volivo offtake.
Authorised commercial agent
The governance
Administered, recorded, auditable
Proceeds run through professionally administered, bank-managed accounts, with on-site record keeping. That is the difference between governed supply and sand-winning.
Bank-managed · on-site records
The anchor
Prof. Wisdom Gagakuma
GKM's Chairman has served on the project team since 2023 — through feasibility and stakeholder engagement to operations. He is a co-founder of GKM Legacy Holdings, and the reason this venture was built to institutional standards from the first day rather than retrofitted to them.
On the project team since 2023
Chain of custody
Four names, in order.
The first three are declared publicly on the project's own site banner,
where Sarbah Limited appears among the project partners, printed “Saba Ltd”. Sarbah Limited is the
sole offtaker; Volta Sands is its partner and authorised commercial agent, bringing buyers to the site.
This is the part no informal supplier can match. Volivo has coordinates, an access road, a gate,
a loading yard and a working dredger. Come and watch your own truck loaded, take your ticket, and
decide for yourself.
Across the Volta the state is shutting illegal dredging and sand-winning down. For a contractor
that turns a supplier's paperwork into a live project risk: material from a source that gets closed
is a delay you did not price, and on public work it is a question you do not want asked.
Everything above is why we can answer that question in one page — and why our delivery documents
say where the sand came from, not just how much of it there was.