Volta Sands Sand & Aggregates · a GKM Legacy Holdings company Menu

Open for loading 24 hours, 7 days · Volivo, Lower VoltaOpen 24/7 · Volivo, Lower Volta

Volta Sands Sand & Aggregates Close the menu
Request a quote Request a call back
Specification binder · issue 01 · Volivo

Write us into
the specification.

You never buy the sand. You decide which sand may be bought — and a clause you write today governs a delivery three years from now. This page exists to make that clause easy: language you can paste, data to check it against, and material to test.

Section 01

Clauses you can paste.

Written to sit inside a normal bill of quantities without argument. Adjust the limits to your works; the substance is the traceability requirement.

Fine aggregate — generalVS-SPEC-01
Fine aggregate shall be natural river sand, dredged from a governed source
(Lower Volta programme, Volivo), pale in colour, free from salt, clay lumps
and organic impurities, with silt content within the limits specified for the
works, and sieved or refined to the grading envelope required.
Traceability of supplyVS-SPEC-02
Each delivery of fine aggregate shall be accompanied by a loading ticket
recording grade, volume, vehicle, date, time and destination, and shall be
traceable on request to the governed operation from which it was won. Material
that cannot be traced to a lawful source shall be rejected.
Structural concreteVS-SPEC-03
Sand for structural concrete shall be clean and well graded across the
specified envelope, with chloride content tested and within the limit specified
for the works. Marine or lagoon sand shall not be used in any reinforced element.
Plaster and renderVS-SPEC-04
Sand for plastering and rendering shall be a fine, consistently graded
river sand with low silt content, free from clay, to avoid crazing and to
achieve the specified surface finish.
Section 02

Why the traceability clause earns its line.

Enforcement against illegal dredging and sand-winning is active across the Volta. For the specifier that converts an ethical preference into a programme risk: material from a source that gets shut down mid-contract is a delay nobody priced, and on public or donor-funded work it is a question that surfaces at the worst moment.

A traceability requirement in the specification protects the works, the client, and the practice that wrote it. It costs nothing to include and it forecloses an entire category of problem.

  • GovernanceA nationally governed programme with a documented chain of custody — not an informal pit.
  • AuditProvenance documented per delivery, not reconstructed afterwards.
  • DurabilityNon-marine, non-salty sand — tested against your chloride limit, not assumed.
  • DefensibilityA named customer and contractor behind the material.
Quality dataOn request / as certified
Source
Dredged riverbed, Lower Volta at Volivo
Colour
Pale whitish-grey to light tan
Chloride
Non-marine, non-salty; tested against your specified limit
Silt
Low; field-demonstrable by settlement test
Texture
Gritty, well-graded
Grading
Four standard grades; refined to envelope on request
Certificates
Independent results published as issued
Section 03

Check it against your own numbers.

We publish what we know and mark plainly what is not yet certified. Where you need a figure we do not yet hold, the honest answer is a sample and your laboratory — which is faster than waiting for us anyway.

Section 04

Questions practices actually ask.

01 Can we test before specifying?

Yes, and we would prefer it. We provide a free sample for your own laboratory — grading, silt, chloride, organics, whatever your specification calls for. Testing once and specifying thereafter is the fastest route for a practice.

02 Do you hold third-party certificates?

Not yet, and we will not pretend otherwise. Independent laboratory results will be published on the quality page, batch by batch and unedited, the moment they are issued. Until then the sample invitation stands, and buyers who have already tested our sand are the reason we make the claims we make.

03 Can you meet a specific grading envelope?

Yes. Beyond our four standard grades we refine to specification, bringing in additional plant where the envelope requires it. Send us the envelope rather than a product name.

04 What about chloride?

The sand is dredged from the riverbed of the Lower Volta, not from the sea or a lagoon — non-marine and non-salty, and we have tested it. Where your specification sets a chloride limit, test a sample against it. We supply one free.

05 Is the source lawful, and can that be shown?

The material comes from the Lower Volta Dredging & Weed Harvesting Project — customer: Volta River Authority; general contractor: JSC Mediterranean Ghana Ltd. The dredging entity holds the operating licences. The chain is set out on our source page and declared on the project’s own site banner.

06 What volumes and lead times can you commit to?

The pit loads around the clock and turns well over two hundred truckloads a day, with additional loading plant brought in as demand rises. For programme works, talk to us about a scheduled supply agreement rather than trip-by-trip ordering.

Section 05

A sample, free, for your laboratory.

Tell us the grade and where to send it, or collect it when you visit the site. Test it against whatever your specification demands. If it meets your envelope, specify it — and if it does not, tell us what it missed and we will refine to it.

Direct line

Technical questions go to the people who load the trucks, not to a call centre. Ask about grading, silt, moisture, scheduling or documentation and you will get an answer from the site.

For specifiers · Volivo 6.0927° N

Specify it once. It holds for years.

Clause language, quality data and a free sample — everything a practice needs to write us in.

Open for loading · 24 / 7 Every tipper served LPOs accepted