Volta Sands Sand & Aggregates · a GKM Legacy Holdings company Menu

Open for loading 24 hours, 7 days · Volivo, Lower VoltaOpen 24/7 · Volivo, Lower Volta

Volta Sands Sand & Aggregates Close the menu
Request a quote Request a call back
6.0927° N · 0.2691° E · Volivo, Lower Volta

Sand that came down the Volta.

Premium river sand from the Lower Volta — supplied with the discipline of a national programme. Graded on site, loaded around the clock. Bring your own trucks, or we'll deliver it anywhere in Ghana.

A dredger working the river with its floating discharge line, pale sand stockpiles and a yellow loader on the bank
Lower Volta Dredging & Weed Harvesting Project Customer: Volta River Authority · Contractor: JSC Mediterranean Ghana Ltd
Volta River AuthorityJSC Mediterranean Ghana LtdDredging Biogas and Innovations LtdSojoes Company LimitedWilbnos Logistics Services LimitedSarbah Limited
The operation

Measured, not claimed.

How much we move and when we're open. Both are checkable — the pit is a place you can drive to.

Throughput200+

Truckloads a day

Hours24/7

Day and night, all week

Tippers20–45

m³ typical — every truck served, however small or large

Loaders02

Running, more on call

A loader tipping sand into a truck body under floodlights at night Night shift

Load at night. Pour at dawn.

Lift clear of daytime traffic and axle-load checkpoints, and be tipping before the working day starts.

How collection works →
The quality standard

The highest-quality river sand on the Volta Lake.

  • Zero saltRiver-dredged, non-marine — tested, and yours to test
  • Zero mudLow silt — plaster won't craze, concrete reaches strength
  • GrittyWell-graded, made for concrete and blockwork
Don't take our word. Test it.Free sample →
Grading · coarse → fine Sized coarse to fine
The Lower Volta Dredging & Weed Harvesting Project
A clamshell grab lifting a mass of water hyacinth out of the river, roots trailing
01 · The mandate

It was never a sand business.

The Lower Volta Dredging & Weed Harvesting Project exists to clear the channel and lift the aquatic weed that chokes it — so the towns downstream are safer when the dams spill, and the river runs, carries boats and holds fish again.

02 · The by-product

The sand is what the work leaves behind.

Dredging a channel produces material. That material is our four grades. Every cubic metre on your site has already done a second job before it got there.

03 · The custody

A chain you can read.

Volta River Authority is the programme customer. JSC Mediterranean Ghana Ltd is the general contractor. Volta Sands runs the commercial offtake. Nothing about where this sand comes from is vague.

04 · The consequence

Every cubic metre leaves the river healthier than we found it.

No other supplier in this market can say that sentence — and we accept being held to it, because the programme’s purpose is public and its work is visible from the riverbank.

The restoration story →
Three promises

You leave with papers.

01 · Loading

Most trucks loaded and away within 30 minutes

Two loaders round the clock, more on call. Your driver arrives, loads, leaves — no day lost in a queue.

02 · Measure

Full measure, ticketed

Grade, volume, truck, time and destination signed at the gate before your driver pulls away. Short load, the difference is free.

03 · Provenance

Sand with papers

Documentation tying every delivery to the governed programme. As the crackdown closes ungoverned pits, that paper keeps you supplied.

Partnerships

Expanding capacity for 2027

We are adding a new cutter-suction dredger to increase our supply to contractors.

Partner with us
Work it out first

Six tools. No sign-up.

Answers on the spot — then send them to WhatsApp or drop them into a quote.

Without JavaScript Each result below is worked from the starting figures in its fields. Change any figure and press Calculate — your result opens on its own page, ready to send to dispatch.

Material estimator

How much sand does the job need?
Volume42m³
Trips · 30 m³2

Trip & truck planner

Cubic metres → trips, by truck class

No storage on site? Ask dispatch for phased just-in-time drops.

ClassCap.Trips
Single-axle7 m³26
Double-axle12 m³15
Standard20 m³9
Large30 m³6
Max45 m³4

Collect vs delivered

The two ways to buy, side by side

Collect at source

6trips you run
  • You bring the tippers
  • No haulage margin
  • ~30 min load, 24/7
  • Ticketed at the gate
How it works →

Delivered to site

6trips we run
  • Partner haulage nationwide
  • No fleet to manage
  • Scheduled to your pour
  • Photo + GPS proof
How it works →
Most of an Accra trip price is haulage and middlemen — not the sand

Cement-saving calculator

Cleaner sand → less cement, fewer rejects
Blocks saved / mo600
Cement bags saved29

Silt self-test

The bottle test — is your sand carrying mud?
4.8%Below 8%: low silt on this field heuristic. A lab sieve test confirms it.
Settled, 1 hr
Illustrative field heuristic: below 8% low · 8% or more high. A lab sieve test and the project specification decide

Full-measure check

What does that tipper actually hold?
True capacity17.9m³
Difference−2.1 m³
That bed holds 17.9 m³ struck level — 2.1 m³ less than you were charged for. Buy ticketed →
Request a quote

Tell us the job.
We'll price it today.

Priced immediately where we can, and never more than 12 hours — always current, because nothing here is a list price.

LPOs accepted. Corporate accounts and standing orders available.

Quote requestVolta Sands · Volivo

A phone number or an email — whichever you would like dispatch to reply on.

Priced immediately where we can — never more than 12 hours. Kept in our own database with our hosting provider and read by the Volta Sands dispatch team; for deliveries, the partner haulier who carries your load is given what they need. Never sold.

Chain of custody

Where this sand comes from, and who stands behind it.

CustomerVolta River Authority
General contractorJSC Mediterranean Ghana Ltd
Sole offtakerSarbah Limited
Authorised commercial agentVolta Sands
Lower Volta Dredging & Weed Harvesting Project Customer: Volta River Authority · Contractor: JSC Mediterranean Ghana Ltd
Volta River AuthorityJSC Mediterranean Ghana LtdDredging Biogas and Innovations LtdSojoes Company LimitedWilbnos Logistics Services LimitedSarbah Limited
Customer Volta River Authority
General contractor JSC Mediterranean Ghana Ltd
Dredging operator Dredging Biogas and Innovations Ltd
Project partner Sojoes Company Limited
Logistics partner Wilbnos Logistics Services Limited
Sole offtaker Sarbah Limited